KAMPUNG BARU SUBANG

Project Overview

Industrial Storage Optimization

This project at Kampung Baru Subang highlights our capabilities in deploying custom-engineered industrial storage. Utilizing the premium 3800 Series Heavy Duty Shelving Rack, My Interack delivered a robust layout built to optimize vertical warehouse clearance while maintaining maximum structural safety and manual picking efficiency.

As a factory-direct manufacturer, My Interack engineered every component to withstand rigorous industrial handling environments, providing high-load stability, durable structural steel uprights, and modular reconfigurability for dynamic storage demands.

Engineering Highlights & Execution

Our turnkey delivery ensured optimal space utilization with zero downtime to ongoing facilities. Key engineering priorities implemented on this site included:

  • Precision floor slab leveling and high-tensile anchor fastening.
  • Optimized beam profiles designed for heavy point loads and distributed weight.
  • High-durability powder coating finish offering superior wear and corrosion resistance.
  • Full conformity to FEM and SEMA international safety guidelines.
3800 Series Heavy Duty Frame System
High UDL Load Rated Levels
Modular Flexible Bay Spans
Project Specifications

Project Data Sheet

Location Kampung Baru Subang, Selangor, Malaysia
System Type 3800 Series Heavy Duty Shelving Rack
Configuration Multi-Tier Medium-to-Heavy Manual Storage
Completion Date 27 March 2013
Contract Scope Design, Fabrication, Supply & Installation
Value of Project MYR 15,000
Quality Standard ISO 9001 / Industrial Safety Compliant

Looking for Similar Storage Solutions?

Whether you require high-capacity shelving or fully integrated pallet racking systems, our team provides complete warehouse engineering and layout planning tailored to your budget.

Inquire Now
+60 11-3302 1235[email protected]