Industrial Storage Optimization
This project at Kampung Baru Subang highlights our capabilities in deploying custom-engineered industrial storage. Utilizing the premium 3800 Series Heavy Duty Shelving Rack, My Interack delivered a robust layout built to optimize vertical warehouse clearance while maintaining maximum structural safety and manual picking efficiency.
As a factory-direct manufacturer, My Interack engineered every component to withstand rigorous industrial handling environments, providing high-load stability, durable structural steel uprights, and modular reconfigurability for dynamic storage demands.
Engineering Highlights & Execution
Our turnkey delivery ensured optimal space utilization with zero downtime to ongoing facilities. Key engineering priorities implemented on this site included:
- Precision floor slab leveling and high-tensile anchor fastening.
- Optimized beam profiles designed for heavy point loads and distributed weight.
- High-durability powder coating finish offering superior wear and corrosion resistance.
- Full conformity to FEM and SEMA international safety guidelines.
Project Data Sheet
| Location | Kampung Baru Subang, Selangor, Malaysia |
|---|---|
| System Type | 3800 Series Heavy Duty Shelving Rack |
| Configuration | Multi-Tier Medium-to-Heavy Manual Storage |
| Completion Date | 27 March 2013 |
| Contract Scope | Design, Fabrication, Supply & Installation |
| Value of Project | MYR 15,000 |
| Quality Standard | ISO 9001 / Industrial Safety Compliant |
Looking for Similar Storage Solutions?
Whether you require high-capacity shelving or fully integrated pallet racking systems, our team provides complete warehouse engineering and layout planning tailored to your budget.
Inquire Now